ENGINEERING SERVICE

Engineering Service

Grid Connection Compatibility Overview

Power system operators in each country are required to meet the grid linkage rules when wind turbines are connected to the power grid, and many countries are already evaluating the effects of wind turbines on the grid by creating appropriate grid linkages.
Therefore, the wind turbine manufacturer must prove that the wind turbine satisfies the grid linkage regulations in order to enter the target market.

GCC (Grid Connection Compatibility) certification procedure

FRT Test Container

HD HYUNDAI PLASPO's FRT Test equipment, which was first developed in Korea, continues to develop HVRT Test equipment in 2021.
HD HYUNDAI PLASPO's FRT Test Container generates low & high voltage at connection point where normally extra-high voltage(higher than 22.9kV) is applied.
By doing this, our products will help you verify grid-code suitability of your distributes generation facilities.(Wind Power, Solar Power, Fuel Cell, ETC.)

· Electricity quality measurement
· Unbalanced voltage generation function
· Double dip, grounding generation function
· 3-phase, 2-phase, low&high voltage generation function
· FRT capability certification test at connection points with extra-high voltage(more than 22.9kV)

HVRT/LVRT Test Container

  • LVRT-3MVA
    LVRT-3MVA
  • LVRT-5MVA
    LVRT-5MVA
  • LVRT-10MVA(UL Certifiaction)
    LVRT-10MVA(UL Certifiaction)
  • HVRT-12MVA
    HVRT-12MVA